History of Naoetsu works
July 1932

Nihon-Soda Corporation Limited rented a part of plant equipment of Shinetsu Nitrogen Fertilizer Corporation
Limited (Shin-etsu Chemical Co., Ltd. as of today) to manufacture Fe-Mn alloy, Fe-Si alloy and various electrodes.

September 1934

Special steel production started.

July 1939

Transfer its works to the present location and renamed to Nihon Soda Corporation Limited Naoetsu Steel works.

December 1947

Heat and Corrosion Resistant steel casting production started.

December 1949

Spined off from Nihon Soda Corporation Limited and restarted its operation as of Nisso Steel Corporation Limited.
May 1951
NS pump production started.

September 1961

Vacuum furnace set up.
January 1970 Renamed to Pacific Metals Company CO.,LTD.

October 1971

Operation of shell mold foundry started.

November 1973

Operation of machine molding foundry started.

March 1974

Operation of lost-wax foundry started.

January 1980

Qualified the works by Nippon Kaiji Kyokai.

May 1980

Qualified the works by Lloyd's Register of Shipping.

June 1981

Operation of furan molding line started.

December 1983

High-energy x-ray radiography inspection Equipment (Linac) set up.

July 1984

Shined off from Pacific Metal Co., Ltd. and renamed to Pacific Alloy Casting Corporation Limited
Nagaetsu Foundry with capital fund of 250 million yen.

February 1985

BM stainless joint (approved type by Japan Water works Association and designated material by
city of Tokyo) production started.

June 1986

Layout machine (large scaled three-dimensional measuring apparatus) was set up.

July 1987

1.5T high frequency induction furnace set up.

September 1988

Operation started at aluminum lost-wax foundry.

October 1988

Construction of outside electricity received facility completed.

September 1989

Capital increased to 490 million yen.

January 1990

Construction of pattern making shop completed.

September 1991

Operation of AIM molding line started.

December 1992

Operation of Electron Beam Perforation (EBP) started.

March 1995

1T high frequency induction furnace set up.

September 1995

Shell mold pouring line renewed.

December 1995

Gantry machining center (five face machining center ) set up.

November 1996

Vectoron (3-D coordinate measuring system) set up.

August 1997

Second term construction for enlarging scale of lost-wax casting completed.