| Company's Profile | |
![]() |
============== Head Office ============= Located 1-3-17, Shinkawa Chuo-ku, Tokyo 104-0033, Japan Telephone : +81 3 55 40 61 24 Facsimile : +81 3 55 40 61 26 ============== Naoetsu works ============== Located 2-25-1, Minato-cho Jyoetsu-city, Niigata 942-0011,Japan Telephone : +81 255 43 34 51 Facsimile : +81 255 43 98 74 **************************************** Capital Fund : 490 million yen Number of Employees : 270 |
| History of Naoetsu works | |
![]() | |
| July 1932 |
Nihon-Soda Corporation Limited rented a part of plant equipment of Shinetsu
Nitrogen Fertilizer Corporation |
| September 1934 |
Special steel production started. |
| July 1939 |
Transfer its works to the present location and renamed to Nihon Soda Corporation Limited Naoetsu Steel works. |
|
December 1947 |
Heat and Corrosion Resistant steel casting production started. |
|
December 1949 |
Spined off from Nihon Soda Corporation Limited and restarted its operation as of Nisso Steel Corporation Limited. |
| May
1951 |
NS pump production started. |
|
September 1961 |
Vacuum furnace set up. |
| January 1970 | Renamed to Pacific Metals Company CO.,LTD. |
|
October 1971 |
Operation of shell mold foundry started. |
|
November 1973 |
Operation of machine molding foundry started. |
|
March 1974 |
Operation of lost-wax foundry started. |
|
January 1980 |
Qualified the works by Nippon Kaiji Kyokai. |
|
May 1980 |
Qualified the works by Lloyd's Register of Shipping. |
|
June 1981 |
Operation of furan molding line started. |
|
December 1983 |
High-energy x-ray radiography inspection Equipment (Linac) set up. |
|
July 1984 |
Shined off from Pacific Metal Co., Ltd. and renamed to Pacific Alloy
Casting Corporation Limited |
|
February 1985 |
BM stainless joint (approved type by Japan Water works Association and
designated material by |
|
June 1986 |
Layout machine (large scaled three-dimensional measuring apparatus) was set up. |
|
July 1987 |
1.5T high frequency induction furnace set up. |
|
September 1988 |
Operation started at aluminum lost-wax foundry. |
|
October 1988 |
Construction of outside electricity received facility completed. |
|
September 1989 |
Capital increased to 490 million yen. |
|
January 1990 |
Construction of pattern making shop completed. |
|
September 1991 |
Operation of AIM molding line started. |
|
December 1992 |
Operation of Electron Beam Perforation (EBP) started. |
|
March 1995 |
1T high frequency induction furnace set up. |
|
September 1995 |
Shell mold pouring line renewed. |
|
December 1995 |
Gantry machining center (five face machining center ) set up. |
|
November 1996 |
Vectoron (3-D coordinate measuring system) set up. |
|
August 1997 |
Second term construction for enlarging scale of lost-wax casting completed. |